Removal of old masonry paint coatings from the exterior walls of  a sound editing suite at the Film Studios near Ramsey.

The Problem

The masonry coatings applied to these walls had failed and needed removing properly before a new and more appropriate treatment was applied.

The Problem

The masonry coatings applied to these walls had failed and needed removing properly before a new and more appropriate treatment was applied.

The Solution

Our ThermaTech machine was used at a temperature of 150°C at an angle of 45°. This took the paint off while still preserving the original surface.

Using the ThermaTech for this job cut down on labour and material costs as it was faster and cheaper than using chemicals.

The Solution

Our ThermaTech machine was used at a temperature of 150°C at an angle of 45°. This took the paint off while still preserving the original surface.

Using the ThermaTech for this job cut down on labour and material costs as it was faster and cheaper than using chemicals.

Venitian Plaster Company was one of the contractors on this project Building Conservation Isle of Man was one of the contractors on this project ThermaTech was one of the contractors on this project